Optimistic concurrency control
Optimistic concurrency control
https://en.wikipedia.org/wiki/Optimistic_concurrency_control
Optimistic concurrency control (OCC) is a concurrency control method applied to transactional systems such as relational database management systems and software transactional memory. OCC assumes that multiple transactions can frequently complete without interfering with each other. While running, transactions use data resources without acquiring locks on those resources. Before committing, each transaction verifies that no other transaction has modified the data it has read. If the check reveals conflicting modifications, the committing transaction rolls back and can be restarted.[1] Optimistic concurrency control was first proposed by H.T. Kung.[2]
【无锁,事务不等待】
OCC is generally used in environments with low data contention. When conflicts are rare, transactions can complete without the expense of managing locks and without having transactions wait for other transactions' locks to clear, leading to higher throughput than other concurrency control methods. However, if contention for data resources is frequent, the cost of repeatedly restarting transactions hurts performance significantly; it is commonly thought[who?] that other concurrency control methods have better performance under these conditions.[citation needed] However, locking-based ("pessimistic") methods also can deliver poor performance because locking can drastically limit effective concurrency even when deadlocks are avoided.
https://www.ibm.com/support/knowledgecenter/en/SSPK3V_7.0.0/com.ibm.swg.im.soliddb.sql.doc/doc/pessimistic.vs.optimistic.concurrency.control.html
- Pessimistic concurrency control (or pessimistic locking) is called "pessimistic" because the system assumes the worst — it assumes that two or more users will want to update the same record at the same time, and then prevents that possibility by locking the record, no matter how unlikely conflicts actually are.
The locks are placed as soon as any piece of the row is accessed, making it impossible for two or more users to update the row at the same time. Depending on the lock mode (shared, exclusive, or update), other users might be able to read the data even though a lock has been placed. For more details on the lock modes, see Lock modes: shared, exclusive, and update.
- Optimistic concurrency control (or optimistic locking) assumes that although conflicts are possible, they will be very rare. Instead of locking every record every time that it is used, the system merely looks for indications that two users actually did try to update the same record at the same time. If that evidence is found, then one user's updates are discarded and the user is informed.
For example, if User1 updates a record and User2 only wants to read it, then User2 simply reads whatever data is on the disk and then proceeds, without checking whether the data is locked. User2 might see slightly out-of-date information if User1 has read the data and updated it, but has not yet committed the transaction.
Optimistic locking is available on disk-based tables (D-tables) only.
https://docs.jboss.org/jbossas/docs/Server_Configuration_Guide/4/html/TransactionJTA_Overview-Pessimistic_and_optimistic_locking.html
6.1.1. Pessimistic and optimistic locking
Transactional isolation is usually implemented by locking whatever is accessed in a transaction. There are two different approaches to transactional locking: Pessimistic locking and optimistic locking.
The disadvantage of pessimistic locking is that a resource is locked from the time it is first accessed in a transaction until the transaction is finished, making it inaccessible to other transactions during that time. If most transactions simply look at the resource and never change it, an exclusive lock may be overkill as it may cause lock contention, and optimistic locking may be a better approach. With pessimistic locking, locks are applied in a fail-safe way. In the banking application example, an account is locked as soon as it is accessed in a transaction. Attempts to use the account in other transactions while it is locked will either result in the other process being delayed until the account lock is released, or that the process transaction will be rolled back. The lock exists until the transaction has either been committed or rolled back.
With optimistic locking, a resource is not actually locked when it is first is accessed by a transaction. Instead, the state of the resource at the time when it would have been locked with the pessimistic locking approach is saved. Other transactions are able to concurrently access to the resource and the possibility of conflicting changes is possible. At commit time, when the resource is about to be updated in persistent storage, the state of the resource is read from storage again and compared to the state that was saved when the resource was first accessed in the transaction. If the two states differ, a conflicting update was made, and the transaction will be rolled back.
In the banking application example, the amount of an account is saved when the account is first accessed in a transaction. If the transaction changes the account amount, the amount is read from the store again just before the amount is about to be updated. If the amount has changed since the transaction began, the transaction will fail itself, otherwise the new amount is written to persistent storage.
【事务独立:通过对资源加锁实现】
事务锁:
悲观锁:因A事务对某资源加锁后,其他事务无法访问该资源,直到该事务访问结束而锁被释放
乐观锁:因A事务对某资源加锁后,其他事务可以访问该资源;但数据更新时候,如果两事务对数据的更新冲突,则发生数据回滚,资源不被任何一个事务修改;如果不同事务对资源的更新一致,则资源被更新。
Optimistic concurrency control的更多相关文章
- Optimistic concurrency control 死锁 悲观锁 乐观锁 自旋锁
Optimistic concurrency control https://en.wikipedia.org/wiki/Optimistic_concurrency_control Optimist ...
- MySQL 的乐观并发控制Optimistic concurrency control
默认情况下, MySQL的Innodb事务隔离级别是重复读 repeatable read, SELECT @@GLOBAL.tx_isolation, @@tx_isolation;REPEATAB ...
- Optimistic Concurrency VS. Pessimistic Concurrency Control
原创地址:http://www.cnblogs.com/jfzhu/p/4009918.html 转载请注明出处 (一)为什么需要并发控制机制 并发控制机制是为了防止多个用户同时更改同一条数据,也 ...
- 数据访问模式:数据并发控制(Data Concurrency Control)
1.数据并发控制(Data Concurrency Control)简介 数据并发控制(Data Concurrency Control)是用来处理在同一时刻对被持久化的业务对象进行多次修改的系统.当 ...
- 第18/24周 乐观并发控制(Optimistic Concurrency)
大家好,欢迎回到性能调优培训.上个星期我通过讨论悲观并发模式拉开了第5个月培训的序幕.今天我们继续,讨论下乐观并发模式(Optimistic Concurrency). 行版本(Row Version ...
- MVCC(Multi-Version Concurrency Control)多版本并发控制机
MVCC(Multi-Version Concurrency Control)是一种多版本并发控制机制.
- CMU Database Systems - Timestamp Ordering Concurrency Control
2PL是悲观锁,Pessimistic,这章讲乐观锁,Optimistic,单机的,非分布式的 Timestamp Ordering,以时间为序,这个是非常自然的想法,按每个transaction的时 ...
- 浅析Postgres中的并发控制(Concurrency Control)与事务特性(上)
转载:https://www.cnblogs.com/flying-tiger/p/9567213.html#4121483#undefined PostgreSQL为开发者提供了一组丰富的工具来管理 ...
- 浅析Postgres中的并发控制(Concurrency Control)与事务特性(下)
上文我们讨论了PostgreSQL的MVCC相关的基础知识以及实现机制.关于PostgreSQL中的MVCC,我们只讲了元组可见性的问题,还剩下两个问题没讲.一个是"Lost Update& ...
随机推荐
- Codeforces 631B Print Check (思维)
题目链接 Print Check 注意到行数加列数最大值只有几千,那么有效的操作数只有几千,那么把这些有效的操作求出来依次模拟就可以了. #include <bits/stdc++.h> ...
- ui设计的好网站(转载)
设计师网址导航 http://hao.uisdc.com/ 站酷 国外: Dribbble - Show and tell for designers.Behance 这两个网站就够了啊 ————— ...
- Resolving the Provisioning Profile Invalid Status
Q: What causes the provisioning profile "Invalid" status? How do I resolve it, and how do ...
- php根据日期时间生成随机编码
订单.申请单之类的需要一个编码,通过下面方法可得 代码如下: $PNUM="PG" . date("YmdHis").rand(1000,9999);
- GIS可视化——热点格网图
一.简介 原理:按照格网大小将区域进行划分,由一个矩形格网替代当前范围内的数据,由格网中心数字代替格网的权重(可以为格网中数据的数量,数据某权重的平均值.最大值.最小值等), 由格网之间颜色的不同表达 ...
- AutoCAD如何将dwf转成dwg格式
dwf转成dwg怎么转, 悬赏分:30 - 解决时间:2009-11-22 10:19 重金:dwf转成dwg怎么转, 我是用在出图上的. 最佳答案 Design Web Format (DWF) 文 ...
- 【Excle数据透视表】如何移动数据透视表的位置
数据透视表创建完成了,现在需要将它移动到D5位置,如何移动呢? 解决办法 通过"移动数据透视表"功能实现数据透视表的位置移动 步骤1 单击数据透视表任意单元格→数据透视表工具→分析 ...
- HDOJ2084数塔问题
数塔问题 题目要求从顶层走究竟层.若每一步仅仅能走到相邻的结点,求经过的结点的数字之和最大值. 非常经典的DP,能够这样考虑,要求从塔顶到塔底最大路径之和.计算时能够考虑自底向上,走最后一步所选的数一 ...
- ARM和STM32的区别及ARM公司架构的发展
ARM和STM32的区别及ARM公司架构的发展 转:https://www.cnblogs.com/kwdeblog/p/5260348.html ARM是英国的芯片设计公司,其最成功的莫过于32位嵌 ...
- SOCKIT 在make时出现(target pattern contains no % stop)???
Make错误(***target pattern contains no % stop) 1. 问题描述 在按照SoC_SW_Lab_13.0.pdf操作时候出现了下列图片的错误 2. Bsp ...