URAL 1994 The Emperor's plan】的更多相关文章

URAL 1994 The Emperor's plan 求组合数 大数用log #include<functional> #include<algorithm> #include<iostream> #include<cstring> #include<cstdio> #include<vector> #include<cmath> #include<string> #include<queue>…
期望$dp$. $dp[i][j]$表示第$1$种人有$i$个,第$2$种人有$j$个的情况下,到达目标状态的期望值.初始化$dp[i][0]=i$. 枚举一下这个状态死多少人,取个$max$,最后$dp[n-k][k]$就是答案. #include<map> #include<set> #include<ctime> #include<cmath> #include<queue> #include<string> #include&…
1144. The Emperor's Riddle Time limit: 1.0 secondMemory limit: 4 MB Background In the olden times there was a young emperor who was the bravest, wisest, richest, most handsome in the whole world. He had proven himself in endless of battles, quests, a…
$$2013-2014\ ACM-ICPC,\ NEERC,\ Eastern\ Subregional\ Contest$$ \(A.Podracing\) 首先枚举各个折现上的点,找出最小宽度,然后找每个存在摄像头的\(y\)值,在这个\(y\)坐标下找到最大间隔,和答案取\(max\)即可 //#pragma comment(linker, "/STACK:1024000000,1024000000") #include<bits/stdc++.h> using na…
http://acm.timus.ru/problem.aspx?space=1&num=1982 1982. Electrification Plan Time limit: 0.5 secondMemory limit: 64 MB Some country has n cities. The government has decided to electrify all these cities. At first, power stations in k different cities…
2062. Ambitious Experiment Time limit: 3.0 secondMemory limit: 128 MB During several decades, scientists from planet Nibiru are working to create an engine that would allow spacecrafts to fall into hyperspace and move there with superluminal velocity…
1272. Non-Yekaterinburg Subway Time limit: 1.0 secondMemory limit: 64 MB A little town started to construct a subway. The peculiarity of the town is that it is located on small islands, some of them are connected with tunnels or bridges. The mayor is…
1814: Ural 1519 Formula 1 Time Limit: 1 Sec  Memory Limit: 64 MBSubmit: 942  Solved: 356[Submit][Status][Discuss] Description Regardless of the fact, that Vologda could not get rights to hold the Winter Olympic games of 20**, it is well-known, that t…
测试计划(Test Plan) 版权声明:本文为博主原创文章,未经博主允许不得转载. 测试计划的概念: 测试计划是一个文档,描述了进行测试的测试范围,测试策略和方法,测试资源和进度.是对整个测试活动进行的一个宏观的规划,确定了测试项目,测试任务,谁来执行任务,被测试特性,不被测试特性以及过程中可能存在的风险等.测试计划能够有效的预防计划的风险,保证了测试活动能够在计划范围内顺利的开展. 测试计划的目的:             ①制定一个可行性的计划,包括测试对象,测试范围,测试方法和策略,测试…
1.explain plan的使用 SQL> explain plan for delete from t_jingyu; Explained. SQL> select * from table(dbms_xplan.display); PLAN_TABLE_OUTPUT ----------------------------------------------------------------------------------------------------------------…